Nylect story begins in 1976 as a humble general sub-contractor in a small local workshop. The company then was registered as Nylect Industrial Services with the office at Dover Avenue. This humble beginning gave birth to Nylect’s story of success. Now, Nylect with more 100 staff strength is a regional player to a number of well-known MNCs, with head office in Singapore and overseas operations Vietnam, Indonesia, Malaysia and China.
The Major Events
1982
The company Nylect Engineering Pte Ltd was incorporated in Singapore. Registered address Blk 4004 Depot Lane, #01-07, Singapore 109758, with a issued paid-up capital of S$ 200K.
The 1st job commenced was Electrical installation and Fire alarm System for concrete factory Phase II, and later Orchard Hotel Meriden for an electrical installation including sound, CATV and TAS system c/w additional works
1983
Public Works Department
Commenced Electrical installation including communication and telephone system for level 2 of Kent Ridge Hospital
1984
CTS Singapore Pte Ltd
Commenced Electrical design, supply, installation, commission and lighting protection system to existing factory at Ang Mo Kio Industrial Park II c/w additional works
1985
Telecommunication Authority of Singapore
Commenced Electrical installation works to telephone exchanges
1986
The Company was CIDB registered under G3 - Electrical Work
MiniScribe Peripherals Pte Ltd
Commenced Electrical installation to 2nd & 3rd storey at Blk 4012 and fire protection system at Blk 4010, 6th & 7th storey at Ang Mo Kio Industrial Park 1
1987
Maxtor Singapore Ltd
Commenced HT and LT Electrical installation to 3rd storey light industrial factory at Ang Mo Kio Ave 9
Seagate Technology International
Commenced upgrading HT/LT at Blk 16 c/w main switchboard at cleanroom and production test area at Seagate Kallang
1989
SGS-Thomson Microelectronics (Ang Mo Kio)
Commenced design, supply and installation of HT/LT to 9 storey block with basement at Ang Mo Kio Industrial Park II
1990
Pepperl & Fuchs (S) Pte Ltd
Commenced design, submission, supply, installation, testing and commission of HT and LT works to 4 storey light industrial factory building at Ayer Rajah Crescent
1991
Singapore Telecom
Commenced Brunei - Singapore submarine cable P/J Singapore civil work
The Mandarin Singapore
Commenced Turn-Key M&E services to renovate the Mandarin Singapore top of ‘M’
Singapore Broadcasting Corporation
Commenced upgrading of LT main switchboard at Caldecott Hill Andrew Road, SBC
1992
The Company was CIDB upgraded under: G4 - Electrical Work
1993
The Company was CIDB further upgraded to : ME05 - L4 Electrical Work
AT&T Microelectronics Pte Ltd
Commenced Turn-key, design, supply, installation, testing and commissioning of air-conditioning system, electrical system, utilities, building and partition works to outfit a factory at No. 3 Kallang Sector
1994
The Company was further upgraded to : ME05 - L5 Electrical Work
Chartered Semiconductor Manufacturing Pte Ltd
Commenced supply and install complete electrical system for proposed CSM FAB II factory at Woodlands Industrial Park D
1995
The Company paid up capital was increased to S$ 1 million
Apollo Enterprise Ltd
Commenced supply, delivery, installation, testing & commissioning of the HT electrical system for proposed new substation / M&E plant room to existing Apollo Hotel
Jurong Point Realty (P) Ltd - Jurong Point
Commenced design and build on electrical system, security, CCTV, CATV and fire intercom systems for proposed commercial development at Jurong West Central 2/Upper Jurong Road
1996
Singapore Post Pte Ltd
Commenced electrical installation for proposed 3-storey postal delivery base at Kian Teck Way
Changi International Logistics Centre
Commenced electrical installation for proposed extension Warehouse Complex at 19 Loyang Way
1997
The Company moved to present premises at Nylect Industrial Building No. 1 Woodlands Sector 1, Singapore 738309
1999
SSMC Hook Up
Commenced Cleanroom Machine Hookup for new SSMC plant
2000
Nylect Technology Limited was incorporated and listed on the Singapore Stock Exchange.
2002
Obtained certification of our Integrated Management System from PSB covering ISO 9000:2000, ISO 14001:1996 and OHSAS 18001:1999
2003
Reorganized Field Operations Departments into Teams to better serve our customer
2004
Infineon HQ.
Commenced design, supply and installation of electrical system
SIA Engineering Co Ltd
Commenced electrical installation for Hangars 4 & 5
2006
Deutsche Bank
Commenced supply and installation testing, commissioning and maintenance of the advance M&E services at One Raffles Quay
2008
Nylect International Pte Ltd acquired Nylect Engineering Pte Ltd and took it private.
Starhub Green
Commenced electrical installation to 7 storey hi-tech multiple user industrial development with a basement at Ubi Ave 1
2009
Singapore Aerospace Engine.
Commenced electrical installation to 2 storey engine overhaul building at Loyang Way for M/S SAESL
313 Shopping Center
Commenced installation of switchgears, transformers, diesel generator sets, HT/LT retriculation works in a new erection of a 7 storey commercial building with 3 basements at Orchard Road Somerset Road
2010
Rolls Royce Achord
Design and build of industrial development comprising of a single storey manufacturing building with 2 storey ancillary facilities & utilities support areas at Seletar Aerospace Park Singapore.
2012
IM Flash
IMFS FAB 10 – Hook up HK26 Electrical System
Jurong Gateway
Commenced electrical installation and security system of a 17 storey building at Jurong Gateway Road Boonlay Way
Obtained certification of our Integrated Management System from Certification International covering ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007.
2013
Stamford American International School Phase 2
Commenced electrical and structure cabling works package at Upper Serangoon.
Schenker Singapore Pte Ltd
Design and build of a Part 3 / Part 6 Storey single user warehouse with Ancillary Office Development Business 2 for Schenker Singapore Pte Ltd
Successful Surveillance Audit and Recommended for continued registration for ISO 9001, ISO 14001, ISO 18001.
2014
Seagate
Design and build 6 storey, Part 9 storey single user Business Park Development with Ancillary facilities and 3 basement carpark floors at Ayer Rajah Avenue.
Gems World Academy
Proposed International School at Yishun Ave 6 / Ave 1.
Achieved bizSAFE Level STAR in Work Safety and Health Council.
JTC Corporation
Proposed Erection of a Single-User Industrial Development (Business 2) Consisting of 1 Block of 3-Storey / Part 2-Storey, 1 Block of 3-Storey and 1 Block of 8-Storey Buildings at Tukang Innovation Drive
LF @ Bulim
Design, supply and Installation of Electrical Services and their Associated works for the Proposed Erection of a 9-Storey Single User Ramp up Warehouse with the Mezzanine Office and Temporary Staff Canteen at Jurong West Street 22/23
Successful Surveillance Audit and Recommended for continued registration for ISO 9001, ISO 14001, ISO 18001.
2015
Kingsland Data Centre
Design and Build Project (TOP) for Data Centre at Sunview Way.
Kuhne + Nagel (K + N) Real Estate Pte Ltd
Erection of a 7-STorey Single User Warehouse with Ancillary Office Development at Pioneer Cresent.
Airbus @ Seletar
2 - Storey Single User Industrial Development at Seletar Aerospace Crescent
GSK HQ
Electrical Installation to Proposed GSK Asia Headquarters at One North
Successful Re-Certification Audit and Re-Certified for ISO 9001, ISO 14001 and ISO 18001.
Renewed bizSAFE Level STAR in Work Safety and Health Council.
2016
Junction City Project Myanmar
Electrical services for office and commercial components for mixed development at Bogyoge Aung San Square at Yangon Myanmar
JEP
Erection of a Part 1 / Part 4 Storey Single User Industrial Development at Seletar Aerospace Crescent
ST Electronic (Omega 2)
Electrical Works to Proposed Erection of 6-Storey Industrial Development for ST Omega 2